Sale by the rotary
/75 Dearfield drive has sold for $3.5 million. It’s listing expired last October 25th and the property wasn’t returned to the MLS so there’s no link to direct the reader to, but these pictures from that original listing are presumably still current and should give the general idea.
got the zebra
but here’s a new twist: the ocelot
still going with the theme
Wind power? What was that all about?
/Governor murphy has the sads
“OoopS! My bad — sorry!”
Offshore wind power company asks to cancel its New Jersey project
Atlantic Shores Offshore Wind has filed a request to cancel its 1.5-gigawatt wind turbine project off the coast of Atlantic City, citing economic and political challenges.
The company cited economic turmoil, including inflation and supply chain disruptions, as well as a federal permitting freeze under the Trump administration, as reasons for the cancellation.
See if you can find anytghing that’s true about this statement from a New Jersey Green Idiot — I can’t:
Ed Potosnak, executive director of the New Jersey League of Conservation Voters, an environmental advocacy organization, said offshore wind energy is important for improving air quality and generating new jobs.
"At a time when New Jersey families are concerned about energy affordability and rising utility prices, we need to be building clean energy to lower costs, create good jobs in the state, lessen our dependence on dirty and expensive oil and gas, and protect our communities from the dangers of climate change," Potosnak said in a statement.
"In New Jersey we lead, and we’re not giving up on offshore wind due to a temporary setback," he said. "We’ll continue to fight to save lives."
Another Massive NJ Wind Project Blows Off Construction to Wait Trump Out
Beege Wellborne, HotAir:
This has been so delicious. Sitting here watching all of rodential New Jersey Governor Phil Murphy's Green grifting schemes flutter to earth in little flaming, fluttering, fragile wisps of so much worthless detritus like tiny pieces of canvas falling to earth after the Hindenburg went boom.
His climate cult fantasies are all blowed up.
Atlantic Shores, the cornerstone of the verminous Murphy's renewable energy plans for the state, has been struggling along in what sailors would call 'being in irons' - where the prevailing wind is so stiff in your face, a ship makes no progress and might even be driven backward a little.
That's what has happened to the Atlantic Shores offshore wind farm since Trump's election and especially post-inauguration.
In February, their biggest partner, Shell, walked away from the project.
Shortly thereafter, the New Jersey Economic Development Authority and the Public Utilities Board delivered their own one-two punches which left the project reeling.
In a sign of the struggling times for the offshore wind industry in the state and the country, ROI-NJ has learned that N.J. Economic Development Authority CEO Tim Sullivan Monday said the organization is exploring alternative uses for the New Jersey Wind Port currently being built in Lower Alloways Creek in Salem County.
“In light of the significant uncertainties in the offshore wind market, we have decided to accelerate our strategic review of options and alternatives for the New Jersey Wind Port,” Sullivan said in a statement.
The Board of Public Utilities, heavily influenced by Gov. Phil Murphy, added a second crippling blow later Monday, saying the state would not accept any of the bids for the fourth solicitation of offshore wind, essentially ending any hope of the Atlantic Shores project
The governor was about beaten into submission to economic reality by the time he finally yanked state funding from all new offshore wind developments.
And today we learned the Atlantic Shores development had officially requested on the 4th of June to pull the plug on the entire project.
The company filed a request to cancel its plans and to terminate its Offshore Renewable Energy Certificate (OREC) order.
Atlantic Shores Offshore Wind, a joint venture between Shell and EDF Renewables, is seeking to withdraw from its flagship New Jersey offshore wind project just months after publicly reaffirming its dedication to the state’s clean energy goals.
On June 4, the company filed a formal petition with the New Jersey Board of Public Utilities requesting to terminate its Offshore Renewable Energy Certificate (OREC) order. The request, if granted, would effectively halt development of the 1.5-gigawatt wind farm located east of Atlantic City that was expected to power roughly 700,000 homes.
The withdrawl request is a major gut punch to New Jersey Governor Phil Murphy as the embattled offshore wind architect enters his final months in office.
Earlier this year, Atlantic Shores issued statements positioning itself as a key contributor to New Jersey’s clean energy future. In a February 3 press release, the company said it “stands ready to deliver on the promise of offshore wind” and called its Project 1 “the most competitive and deliverable project proposed in NJ4.” At the time, the firm expressed disappointment after the fourth offshore wind solicitation concluded without awarding any projects.
…. In the meantime, Murphy is trying to paper over the pain that his policies are going to cost New Jersey utility rate payers by cleverly disguising a scheduled July rate hike as something entirely different. He's managing to put it off until after this fall's elections.
NEW: We are going to provide direct economic relief to EVERY household in New Jersey to lower the cost of your monthly energy bill.
— Governor Phil Murphy (@GovMurphy) June 5, 2025
✅ $100 deduction from every household’s energy bill
✅ Up to a $250 deduction for qualified ratepayers pic.twitter.com/U79OevSKFT
From a different source, here’s a history of electricity price increases, cents per kWh
CT 2024: 33.01 2013: 17.58 2003: 11.31
ME 2024: 26.22 2013: 14.56 2003: 12.37
NJ: 2024: 19.58 2013; 15.67 2003:10.67
It’s no coincidence that the huge jump in prices the past 10 years also marked the global warming kooks’ accelerated drive to ban new gas pipelines and electrical transmission projects, closing nuclear plants, shutting off hydro-power generation, and passing out huge subsidies to their political allies to build out huge solar and wind facilities. “The wind and the sun are free”, these liars assure a gullible public, but they never mention the infrastructure costs incurred in harnessing and distributing that power. This is deliberate.
Thought experiment: how would the media cover 500 Proud Boys burning cars and pelting policemen with bricks?
/You mean the rallies 🤣? pic.twitter.com/DTNwxUPqew
— JX Write (@JXWrite) June 9, 2025
I've heard, though I've never seen evidence to support it, that not all transgenders are insane. This gentleman does nothing to advance that claim
/Minnesota Democrats, Including Tim Walz, Cutting Illegal Immigrants Out of Medical Assistance
David Strom HotAir:
The reason? Shockingly enough, there isn't enough money to spread around to all their favored constituencies after having blown an enormous budget surplus in the last biennium.
Leftists both inside and outside the House Chamber are not happy at all.
Absolutely Bizzare rant on the Minnesota House floor by Rep Finke. This is the Minnesota DFL in a nutshell. pic.twitter.com/SOUx6pOnG8
— MN Republicans Northland Edition (@MNHD3BGOP) June 9, 2025
Treat yourself to this 37-second snippet of Mr. Finke’s screech; it’s wonderful, and it’s liberal derangement encapsulated. Simply wonderful.
Strom comments on just two of the politician’s arguments:
What is striking about these arguments is the simultaneous claims that white people can't build things (a bizarre claim, since migrants are crossing into the United States because we have built the strongest economy in the world) and that the people who will save our economy can do so only if we spend billions of dollars subsidizing them.
Make that make sense. Most of us have to make money to pay for our healthcare, but the people who really drive our economy need us to contribute to their healthcare, too?
Slowly I turned ...
/79 Richmond Hill Drive, listed at $7.195 million April 25th, dropped 3.4% on May 7th to $6.950 and shaved off another 2.2% June 7th to $6.795. Getting there.
(In the unlikely event that you’re not familiar with the reference, or would just like to see the skit again, here it is — it’s still funny)
She's Gotta Have It
/36 Edgewood Drive was listed in March at $3.975 million, went via bidding war in 5 days, and closed today at $4.925 million.
but who’s going to bake the cheesy bread now that consuela’s been shipped back to ecuador?
"Journalism", Part II — Woe among the Breton Reds
/“So sorry you had to die and dash, but you know. …”
Washington Post just casually re-writing history about the 50 migrants Ron DeSantis flew to Martha’s Vineyard in 2022. Massachusetts activated the National Guard (for 50 migrants!!) and within 44 hours of their arrival they were shipped to a military base. pic.twitter.com/NBkwDYJfPs
— Rachel Bovard (@rachelbovard) June 9, 2025
Martha's Vineyard residents cheer as illegal immigrants are led to a bus to a military facility pic.twitter.com/0iLDln2Pmn
— Jack Poso 🇺🇸 (@JackPosobiec) September 17, 2022
Related: “Who will make our cheesy-bread? Change our sheets?”
'Oh, Dear, Muffin! Whatever Shall We Do?' The Trauma Of Martha's Vineyard v Illegals Continues
…. ISLAND CLEANSE COMPLETED
Or almost. The island natives apparently had done some picking and choosing among the newcomers before booting the vast number of them, and found four of them to be acceptable enough to allow them to remain.
I don't even want to tell you what that sounds like, particularly when one wound up being a housekeeper.
...There was much rejoicing.
…She said it was important to her to pay her own way and not become a burden on the community that welcomed her. Her employer, a woman in her 60s who declined to be named because she was employing someone without a work permit, said Ms. Cauro felt like part of the family.
“My gosh, Bunny, what ever will we do without our gardener?” https://t.co/LTLxuOR5nm
— Adrian Vermeule (@Vermeullarmine) June 8, 2025
A million-dollar home excavation project has been delayed because workers were too afraid to show up at the construction site. A pool at a vacation inn was closed to guests after the maintenance crew didn’t arrive. And entire businesses on this New England island have shut down.
Life on Martha’s Vineyard and the adjacent island of Nantucket has been disrupted since officers arrested dozens of immigrants late last month, igniting fear among undocumented workers who form the backbone of the workforce here just as the busy summer season gets underway.
“The money is just going to stop flowing,” said a 33-year-old Brazilian man who owns three businesses on the Vineyard and spoke on the condition of anonymity because he has no legal status in the United States. “The U.S. is only losing in pushing us out.”
Masked immigration officers wearing bulletproof vests arrived on Coast Guard boats right after the Memorial Day weekend and detained several dozen people on both islands. Federal authorities described the arrests as part of a massive sting across Massachusetts that resulted in nearly 1,500 arrests. On the islands, about 40 people were detained, including an alleged MS-13 gang member and someone described as a “child sex offender,” according to the Immigration and Customs Enforcement field office in Boston. Most had no criminal record and were stopped on their way to work, community members said.
The arrests hit a nerve in a liberal enclave known for welcoming everyone: presidents — former president Barack Obama has an oceanfront property here — LGBTQ+ activists, racial minorities, celebrities and a large cluster of immigrants from Brazil. People checked in on friends and warned them to stay off the roads. Residents staged a protest at the ferry docks where agents were loading shackled migrants onto boats. One man followed the officers with a camera and heckled them.
The entire immigration debate in US comes down to if you see this undisputed fact (we have an imported servant class) as a positive thing, or a negative thing pic.twitter.com/ai9jIqd0jM
— Chris Arnade 🐢🐱🚌 (@Chris_arnade) June 9, 2025
“Journalism” (Updated)
/WATCH: ABC News wants you to know what is happening in California isn’t a violent riot.
— Steve Guest (@SteveGuest) June 9, 2025
It’s “just a bunch of people having fun watching cars burn.” — ABC 7’s Marc Brown. pic.twitter.com/xjiQZJyuDq
UPDATE
Again, I ask, if they’ll lie about something this obvious, countering video evidence, what won’t they lie to you about?
— Bonchie (@bonchieredstate) June 9, 2025
How did we get four years of lying about Joe Biden’s health? This is how. There are no limits. https://t.co/c6UCzs289G
Contracts
/958 lake avenue $5.945 million (not clear whether that includes this house/land on 4 acres, or also the 8 adjoining acres) 1,128 DOM